EV Charger Installation in Cornwall and Devon.
EV Charging.
Fitting a charge point is an electrical installation. We check the supply, assess the consumer unit, verify the earthing and certificate the circuit. NICEIC registered.
What we cover
Get an EV charger quoteMost homes can take a 7kW charge point on a dedicated circuit. Some need work first, because an older property may have an original consumer unit, a shared earth or a supply that will not carry the extra load. We check all of that at survey, before you commit. Then we install, test and certificate the circuit.
Who this service is for
Domestic / Commercial
- Home charge point installation
- Workplace and commercial charge point installation [CONFIRM WITH CLIENT: the service audit lists EV charging under domestic renewables only.]
- Incoming supply and load assessment
- Consumer unit upgrade where the existing board cannot take the circuit
- Earthing and PEN fault protection
- Dedicated circuit installation and certification
- Maintenance and repair of existing charge points
- Fault finding on units that have stopped charging
EV Charging, across Cornwall and Devon.
Why choose us
Working with GM Services
-
NICEIC registered, so the installation certificate comes from us
-
Supply and earthing checked before you commit
-
Consumer unit and circuit work handled in-house if the existing board will not take it
-
We also service and repair charge points installed by others
How we work
-
01
Get in touch
Call the office on 01726 821 559, or 07879 234479 out of hours. You can also enquire from the contact page at any time.
-
02
Free survey or quote
We look at the job, tell you what it needs and price it. No obligation.
-
03
Works carried out
Directly employed engineers on our core trades. Clear dates and tidy sites.
-
04
Certification and aftercare
The paperwork the job requires, and a number to call if anything changes.
We cover Cornwall and Devon
- St Austell
- Truro
- Newquay
- Bodmin
- Wadebridge
- St Columb Major
- Roche
- Liskeard
- Falmouth
- Helston
- Launceston
- Saltash
- Plymouth
- Exeter
Industrial and specialist work, coded welding, steam plant and gas purging, extends further across the South West.
Common questions
Before you call
How much does an EV charger installation cost in Cornwall?
The charger and a standard install are the predictable part. The variable is your existing setup, whether the consumer unit can take another circuit, how far the cable run is, and whether the earthing arrangement needs work. We check all three before quoting.
Do I need my consumer unit upgraded to fit an EV charger?
Often, yes. A charge point needs its own protected circuit, and older boards have no spare way or no RCD protection. We tell you at survey whether yours will take it.
How long does it take to install a home charge point?
Three to four hours for a straightforward install with a short cable run. Longer if the board needs changing or the cable has to cross the property.
Can you install EV chargers for a business car park?
Workplace installations start with a load assessment, because several chargers running at once is a different problem from one. We install, test and certificate the circuits.
My EV charger has stopped working, can it be repaired?
Usually, including units installed by someone else. Most faults are the supply side, the protective device or the unit itself, and testing tells us which within the first visit.
Do I need planning permission for an EV charger?
Not in most cases. A domestic charge point is normally permitted development, provided it is within the size limits and does not face directly onto a highway. Listed buildings and conservation areas are the exception, and we tell you at survey if yours is one.
Ready to get started?
Tell us about your project.





